[Dawn-DAWG] Dawn DAWG (subgroup only): Telecon Thur. May 5 at 0730 PDT (1630 CEST)
Joseph Mafi
jmafi at igpp.ucla.edu
Wed May 4 13:15:55 PDT 2016
Hi Folks,
The regular DAWG meeting in cancelled. I would like to hold a discussion
with the VIR team regarding the redelivered VIR Vesta data. Only
interested parties need attend. I will send out an email with additional
details to follow
Thanks,
joe
.
Link to meeting WebEx:
https://jplwebex.jpl.nasa.gov/orion/joinmeeting.do?ED=kT5hGvk3Vprdug3ERfURng==
Direct dialing information:
Call into JPL WebEx: 818-35(4-4044) or Toll Free 844-JPL-WEBX
(844-575-9329)
Meeting Number: 999 257 391
Archive Delivery Status
=======================
* Ceres coordinate system- Kait-centered coordinate system approved.
Coordinate system description paper must be updated prior to release.
* FC
* Ceres Approach-HAMO L-1A & L-1B volumes delivered to PDS for
peer review (Apr 2016)
* Ceres Approach/RC3 L-1A volume liens resolved; new data
(calibration images) added; (Apr 2016)
* pre-Vesta cruise L-1A and L-1B volumes in lien resolution
- Certified with liens (May 2014)
* Calibration volumes: FC1 certified; FC2 in peer review (Sep
2015)
* GRaND
* Ceres cruise L-1A certified with liens; in lien
resolution;(Apr 2016)
* Ceres Approach/RC3/HAMO L-1A & L-1B volumes certified with
liens; in lien resolution;(Apr 2016)
* VIR
* Ceres Survey - HAMO L-1A & L-1B volumes delivered to PDS for
peer review (Apr 2016)
* Ceres Approach/RC3/Survey L-1A volumes (excluding Survey IR
volume) lien resolution delivered to PDS (Apr 2016)
- Certified with liens; released (Oct 2015)
* Ceres Approach/RC3 L-1B volumes lien resolution lien
resolution delivered to PDS (Apr 2016)
* Cruise L-1A and L-1B volumes in lien resolution (Jul 2015)
* Vesta high level product volumes in preparation (Dec 2014)
* Vesta L-1B recalibrated data in preparation (UNK)
More information about the Dawndawg
mailing list