[DSC-Weekly] Dawn DSC tagup: Meeting Thursday, July 17 at 0800 PDT (1700 CEST) MeetingId=0000
Gutierrez-Marques, Pablo
gutierrez at mps.mpg.de
Fri Jul 18 01:29:35 PDT 2014
Hi Carol,
Joachim mentioned from yesterday's teleconference the possibility to perform the stray light calibration with Jupiter instead of Ceres as currently planned.
We have considered the case and found that the circumstances are not so promising. As of today, Jupiter has an apparent diameter of 1.5 pixels, which is slightly below the spec, and it is getting worse with time. Additionally, Ceres has, in comparison with Jupiter, the advantage of allowing spectral calibration.
All in all the team believes that Jupiter is not a suitable alternative to Ceres for the stray light calibration.
Kind regards,
Pablo
From: dscweekly-bounces at igpp.ucla.edu [mailto:dscweekly-bounces at igpp.ucla.edu] On Behalf Of Polanskey, Carol A (394E)
Sent: Thursday, July 17, 2014 4:47 PM
To: dscweekly at igpp.ucla.edu; Ripken Dr., Joachim; Hall, Ian; yamashita at psi.edu; Hall, Andrew S (397J)
Subject: [DSC-Weekly] Dawn DSC tagup: Meeting Thursday, July 17 at 0800 PDT (1700 CEST) MeetingId=0000
Note that Marc, Keri and Drew will probably not be dialing in because of the ORT (Operations Readiness Test).
Agenda
* Short questions from instrument teams that would not otherwise be covered
* ORT report - C. Polanskey
* dc074/dc075 status - K. Bean/C. Polanskey
* dc077 status - C. Polanskey/S. Joy
* RC3 ISB update status - S. Joy
* LAMO ISB - X. Liu
Sequence Development Milestones:
07/09/14 LAMO ISB MPST Pass 1 products released (da801, 900, 901)
07/18/14 dc074 command conference
07/24/14 LAMO ISB MPST Pass 1 products released (da902, 903)
07/??/14 LAMO ISB MPST Pass 1 Review meeting
07/30/14 dc075 MPST Kick-off
08/01/14 dc075 MPST Pass 1 inputs due
08/05/14 dc075 MPST Pass 1 review meeting
08/15/14 dc075 MPST Pass 2 review meeting
08/21/14 Ceres Risk Review
09/03/14 dc077 Pre-Build Kick-off
09/05/14 dc077 Pre-Build SciTOL due
09/10/14 dc077 Pre-Build instrument inputs due
09/10/14 dc077 Tabletop meeting
09/12/14 dc077 Pre-Build review package #1
09/17/14 dc077 Pre-Build instrument inputs update
09/19/14 dc077 Pre-Build review package #2
09/23/14 dc077 Pre-Build checklists due
09/24/14 dc077 Walkthrough meeting
09/24/14 dc077 MPST Kick-off
09/26/14 dc077 MPST Pass 1 inputs due
09/30/14 dc077 MPST Pass 1 products released
10/01/14 dc077 MPST Pass 1 review package
10/06/14 dc077 MPST Pass 1 review meeting
10/10/14 dc077 MPST Pass 2 review meeting
10/13/14 dc077 uplink of products
10/14-17/14 Science Team Meeting
Get ready for Ceres
Next instrument activity:
07/21/2014 dc073 HGA pass GRaND playback (power off occurs earlier during thrusting)
08/18/2014 dc074 HGA pass FC2 Checkout & FC1 FSW
09/15 /2014 dc075 HGA pass FC1 Checkout playback
10/27-31/2014 dc077 Straylight Calibrations, GRaND
Procedure for telecon participation
--------------------------------------------------------
866-328-8761 (plus country code for international callers) Follow the various prompts.
-OR-
-- From JPL telephones, dial 4-3434
-- From local, off-Lab telephones, dial (818) 354-3434
-- From long distance (USA), use the following procedure:
1. Dial (800) 367-5754
2. Upon hearing the tones, press 5-7-5 (the numbers for J-P-L)
3. At the second dial tone, press 4-3434 When prompted, dial the
meeting code: 0000
-------------- next part --------------